Ninja Zeon 5 CS 1 L

T12462
Use: In cereals for the control of the crop defoliator beetle and aphid at 0.15-0.2 l/ha. In orchards, black beetles and vines, 0,2-0,3 l/ha for the control of moths, aphids and fruit flies. For control of sucking and chewing pests of vegetables (peppers, tomatoes, cabbages, cucumbers) at 0,2-0,4 l/ha. For the control of corn earworm, corn earwo... Long description
Shipping
block
A termék most nem kapható. Később még valószínűleg elérhető lesz.
Use: In cereals for the control of the crop defoliator beetle and aphid at 0.15-0.2 l/ha. In orchards, black beetles and vines, 0,2-0,3 l/ha for the control of moths, aphids and fruit flies. For control of sucking and chewing pests of vegetables (peppers, tomatoes, cabbages, cucumbers) at 0,2-0,4 l/ha. For the control of corn earworm, corn earworm, corn earworm, caterpillars of the owl 0,25 - 0,3 l/ha,2 l/ha is the appropriate amount In sunflowers 0,15-0,2 l/ha against aphids and bedbugs In potatoes against aphids 0,15-0,2 l/ha In peas against aphids 0,15-0,2 l/ha


Insecticide
Plant protection product
Authorisation Number:
0 days
Dosage:
250 ml, 1 l
Active ingredient content:
50 g/l
lambda-cyhalothrin
Active substance family:
pyrethroids
Formulation:
CS (capsulated suspension)
Indication of danger:
Very dangerous for aquatic organisms! Bee hazard: moderate risk!

Category of circulation: III.

The well-known pyrethroid

Special Zeon formulation for longer lasting, stronger adhesion.
SPECTRUM OF ACTION AND DOSAGE
Culture Pest Dose, application date D.O.I.
Ryegrass
(wheat, barley, triticale, rye, oats) aphids, seed-whitening beetles, cereal aphids 0,15-0,2 l/ha,
application water: 250-400 l/ha
Maximum 2 applications at 12-day intervals, treatment date (based on phenological status): flowering (BBCH 69) 28 days
sugar beet aphid, mealy bug, aphid, owlfly larvae 0,2 l/ha,
application water: 250-400 l/ha
Maximum 3 applications at 10-day intervals, time of treatment (based on phenological status): end of row closure (BBCH 39) 14 days
Sunflower aphids, bedbugs, owl aphid larvae 0,15-0,2 l/ha,
application water: 250-400 l/ha
Maximum 2 applications at 10 days intervals, treatment date (based on phenological status): lemon ripening (BBCH 85) 28 days
maize (fodder, seed, seedlings) corn borer, corn earworm, caterpillars of owl midge 0,25-0,3 l/ha,
amount of water needed for application: 300-500 l/ha
Maximum 2 applications at 10-day intervals, treatment date (based on phenological status): milk maturity (BBCH 75) feed: 14 days
forage: 3 days
seed: no limitation if used as prescribed
0,15-0,2 l/ha for winter oilseed rape, white mustard rape stem borer, rape leafroller, rape leaf beetle, aphids, rape aphid, rape flea,
application water: 250-400 l/ha
Maximum 2 applications at 10 days intervals, treatment date (based on phenological status): Becruitment (BBCH 75) 28 days
potato aphids 0,15-0,2 l/ha,
amount of water needed for application: 400-600 l/ha
Maximum 3 applications at 10-day intervals, treatment time (based on phenological status): line closure (BBCH 39) 14 days
alfalfa foliage and seed pests 0,15-0,2 l/ha,
amount of water needed for application: 300-400 l/ha
Maximum 3 applications at 10-day intervals, treatment date (based on phenological status): maturation (BBCH 80) 28 days
apple fruit (apple, pear, quince, pear, pear) aphids, apple moth, downy mildew, chinch blossom moth 0,2-0,3 l/ha,
application water: 600-1500 l/ha
Maximum 2 applications at 8-day intervals, time of treatment (based on phenological status): red bud and white bud stage (pear) (BBCH 57) 3 days
spotted wing muslica 0,3 l/ha,
amount of water needed for application: 600-1500 l/ha
Maximum 2 applications at 8-day intervals, time of treatment (based on phenological status): red bud and white bud stage (pear) (BBCH 57)
stone fruit (peaches, apricots, plums, cherries, sour cherries) fruit moths, aphids, cherry borers, leafminers, golden aphids 0,2-0,3 l/ha
water needed for application: 800-1500 l/ha
Maximum 2 applications at 8-day intervals, treatment timing (based on phenological status): colour development (BBCH 83) 3 days
spotted wing muslica 0,3 l/ha,
amount of water needed for application: 800-1500 l/ha
Maximum 2 applications at 8-day intervals, time of treatment (based on phenological status): development of colouration (BBCH 83)
almond aphids, almond heartworm 0,2 l/ha,
amount of water needed for application: 800-1000 l/ha
Maximum 3 applications, 12 days apart, time of treatment (based on phenological status): final fruit size (BBCH 80) 14 days
hazelnut hazelnut 0,2 l/ha,
amount of water needed for application: 800-1000 l/ha
Maximum 3 applications at 12-day intervals, treatment date (based on phenological status): final fruit size (BBCH 80) 14 days 14 days
walnut apple aphid, aphids, nut fly 0,2 l/ha,
amount of water needed for application: 800-1500 l/ha
Maximum 3 times at 10 days intervals, treatment date (based on phenological status): final fruit size (BBCH 81) 14 days
grape vine moths 0,15-0,25 l/ha,
amount of water needed for application: 800-1000 l/ha
Maximum 2 applications, 10 days apart, time of treatment (based on phenological status): bunch closure (BBCH 78) 3 days
spotted wing muslica, American grape berry 0,25 l/ha,
amount of water needed for application: 800-1000 l/ha
Maximum 2 applications at 10 days intervals, time of treatment (based on phenological status): bunch closure (BBCH 78)
strawberry aphids, spotted wing muslica 0,2 l/ha,
application water: 400-1000 l/ha
Maximum 2 applications at 14-day intervals, time of treatment (based on phenological status): start of varietal colouring (BBCH 85) 3 days
currant, caraway aphids, spotted wing muslica 0,2 l/ha,
water application rate: 600-1200 l/ha
Maximum 2 applications at 14-day intervals, time of treatment (based on phenological status): end of flowering, complete petal fall (BBCH69) 14 days
raspberry aphids, spotted wing muslica 0,2 l/ha,
water application rate: 600-1200 l/ha
Maximum 2 applications at 14-day intervals, treatment date (based on phenological status): end of flowering (BBCH69) 7 days
Blackberry aphids, spotted wing muslica 0,2 l/ha,
amount of water needed for application: 600-1200 l/ha
Maximum 2 applications at 14-day intervals, time of treatment (based on phenological status): end of flowering (BBCH69) 14 days
Black elderberry American whitefly, aphids 0,3 l/ha,
application water: 500-1000 l/ha
Maximum 2 applications, 10 days apart, treatment date (based on phenological status): flowering (BBCH69) 14 days
pepper aphid larvae, aphids 0,2-0,4 l/ha,
amount of water needed for application: 400-800 l/ha
Maximum 2 applications at 10-day intervals, time of treatment (based on phenological status): start of ripening (BBCH82) 5 days
tomato owl aphid larvae, aphids 0,2-0,4 l/ha,
amount of water needed for application: 400-600 l/ha
Maximum 2 applications at 10 days intervals, time of treatment (based on phenological status): start of ripening (BBCH82) 3 days
Egg fruit (sprouted) owl aphid larvae, aphids 0,2 l/ha,
amount of water needed for application: 400-600 l/ha
Maximum 2 applications at 10-day intervals, time of treatment (based on phenological status): start of ripening (BBCH82) 3 days
Cucumber aphid larvae 0,2-0,4 l/ha (10 days after harvesting),
amount of water needed for application: 400-800 l/ha
Maximum 2 applications at 10 days intervals, time of treatment (based on phenological status): start of fruit set (BBCH70) 3 days
cabbage, cauliflower, cauliflower, broccoli, kale owl larvae, aphids, cabbage leafminer 0,2-0,4 l/ha
application water: 400-600 l/ha
Maximum 2 applications, 10 days apart, treatment timing (based on phenological status): 50 % head diameter (BBCH45) 3 days
pea aphids 0,15-0,2 l/ha,
amount of water needed for application: 400-600 l/ha
Maximum 2 applications at 5-day intervals, time of treatment (based on phenological status): start of pod formation (BBCH72) 3 days
bean cotton - bean aphid 0,15-0,2 l/ha
amount of water needed for application: 400-600 l/ha
Maximum 2 applications at 12-day intervals, time of treatment (based on phenological status): bean pods emerge on pods (BBCH79) 3 days
lettuce owl aphid larvae, aphids 0,125 l/ha,
amount of water needed for application: 400-600 l/ha
Maximum 2 applications at 12-day intervals, treatment date (based on phenological status): 50% leaf mass (BBCH45) 7 days
horseradish strawberry, brassica 0,3 l/ha,
amount of water needed for application: 400-600 l/ha
Maximum 2 applications, 14 days apart, time of treatment (based on phenological status): end of root growth (BBCH 49) 7 days
endive, pepper mustard (arugula), lettuce pigeon pea, owlfly larvae, aphids 0,2-0,25 l/ha,
amount of water needed for application: 400-600 l/ha
Maximum 2 applications at 12-day intervals, time of treatment (based on phenological status): leaf development (BBCH45) 7 days
Sorrel, spinach owl larvae, aphids 0,15 l/ha,
amount of water needed for application: 400-600 l/ha
Maximum 2 applications, 12 days apart, time of treatment (based on phenological status): leaf development (BBCH45) 7 days
zöldfűszernövények (metélőhagyma, metélőpetrezselyem, zellerlevél, kapor, angyalgyökér, lestyán, szurokfű, borsikafű, tárkony, zsálya, izsóp, thyme, lemon balm, rosemary, coriander, basil, mint, marjoram, marjoram, succulent turmeric) owl larvae, aphids, bedbugs 0,2-0,25 l/ha,
application water: 400-600 l/ha
Maximum 2 applications at 12-day intervals, time of treatment (based on phenological status): leaf emergence (7 days before harvest) 7 days
garlic, shallots aphids, moths, flies, thrips 0,15 l/ha
amount of water needed for application: 300-600 l/ha
Maximum 3 applications at 12-day intervals, treatment timing (based on phenological status): onion head formation (BBCH 45) 21 days
onion aphids, flies, moths, thrips 0,1-0,15 l/ha,
amount of water needed for application: 200-600 l/ha
Maximum 1 time, treatment date (based on phenological status): onion head formation (BBCH 45) 14 days
sweet fennel aphid, moth, bedbug, ground flea species 0,2 l/ha,
amount of water needed for application: 300-600 l/ha
Maximum 2 applications at 12-day intervals, time of treatment (based on phenological status): leaf development (BBCH 45) 7 days
medicinal plants (cat's-root, marigold, chamomile, Roman chamomile, milk thistle, St. John's wort, yarrow, foxglove, medical chickweed, lavender, irongrass, horseweed) aphid, moth, bedbug, ground flea species 0,2 l/ha,
amount of water needed for application: 300-600 l/ha
Maximum 1 application, time of treatment (based on phenological status): leaf development (BBCH 45) 14 days
tobacco aphids, owl aphids 0,2 l/ha,
amount of water needed for application: 400-800 l/ha
Maximum 2 applications at 10 days intervals, time of treatment (based on phenological status): end of leaf development (7 days before harvest) (BBCH 49) No restrictions for prescribed use

This product specification is for information only, please read the instructions on the label before use!
Weight: 1 kg
Width: 100 mm
Height: 300 mm
Length: 100 mm
Aviability: 1-4 nap
Basic sales unit: db
Culture: Dísznövény, Gyümölcs, Szőlő, Zöldség

0 reviews, total: 0

Did you purchase it? Rate the product!

Share your experiences with the product with other customers as well.


0 reviews, total: 0

Did you purchase it? Rate the product!

Share your experiences with the product with other customers as well.